One-pager OpEx Savings: Stop Bleeding Money on Excess Pipeline Pressure Pipelines pump at higher pressure than needed to guarantee delivery — then bleed it off at the destination. That excess pressure is wasted energy spend.
- Up to 16% power cost reduction
- Lean pressure profiles with lower energy per barrel
- Contracted volumes still met — lean pressure ≠ less delivery
- No CapEx required — deploys on existing infrastructure